Parisi, P.
is the vice president (VP) of marketing for Compressor Controls Corp. (CCC) Global. He previously served as VP of sales and marketing with FOMAS Group, and as oil and gas marketing leader with GE. Mr. Parisi earned his MBA degree in global management and international business from the University of Phoenix
Optimizing turbomachinery energy savings with control technologies
Plant managers who work in a hydrocarbon-processing-industry (HPI), power-generation or other industrial facility can relate to the need to optimize energy consumption. Opportunities to reduce unneces..
HP Viewpoint: Optimize control systems with preventive maintenance
Process Optimization
/ Project Management
/ Americas
/ Asia/Pacific
/ Compressors
/ Drivers
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Management
/ Middle East
/ Motors
/ Pumps
/ Rotating Equipment
/ Safety
/ Turbines
Ensuring equipment integrity by conducting thorough maintenance provides multiple benefits, from maximizing machine uptime and minimizing process shutdowns, to prolonged equipment service life and imp..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Brazil's Petrobras approves $1.2 billion investment for renewable fuels plant 6/22
- First batch of equipment arrives in Kazakhstan for $7.7-B Atyrau polyethylene project 6/22
- Explosion at Qatar's Ras Laffan LNG complex kills 13, injures 66 6/22
- Asia has plenty of crude oil, but refined fuels remain tight 6/22
- Fire extinguished at Marathon's Galveston Bay Refinery in Texas (U.S.) 6/22
- El Nino, expanding ethanol use squeeze India sugar supply 6/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

