Fernández, A.
Andrea Fernández is an FCC and Merox Process Engineer for bp. She joined bp in 2020 as a Process Engineer for the treatment units. Since mid-2021, she has been working as an FCC Process Engineer. In Spain, Fernández earned a chemical engineering degree from the University of Santiago de Compostela, along with a specialized MS degree in industrial chemical engineering from the University of Alicante.
Defossilizing the FCCU via co-processing of biogenic feedstock: From laboratory to commercial scale
Environment & Safety
/ Refining
/ Biofuels
/ Carbon Management
/ Catalysts
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Process Optimization
/ Products
/ Reactors
/ Treating
/ Europe
Oil demand is expected to reach record highs this year1 after a sharp rebound following the COVID-19 pandemic.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Phillips 66 sets the record straight on Gregory J. Goff’s relationship with Elliott Management 4/9
- Neste begins SAF production at its renewables refinery in Rotterdam, the Netherlands 4/9
- Clariant, Technip Energies to introduce new catalyst for low steam-to-oil ratios in styrene production 4/9
- U.S. exits carbon talks on shipping, urges others to follow 4/9
- Analysis: U.S. refiners unlikely to spend big to process more domestic oil 4/9
- China petchem plants face shutdown as tariffs on U.S. LPG loom 4/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction