Fernández, A.
Andrea Fernández is an FCC and Merox Process Engineer for bp. She joined bp in 2020 as a Process Engineer for the treatment units. Since mid-2021, she has been working as an FCC Process Engineer. In Spain, Fernández earned a chemical engineering degree from the University of Santiago de Compostela, along with a specialized MS degree in industrial chemical engineering from the University of Alicante.
Defossilizing the FCCU via co-processing of biogenic feedstock: From laboratory to commercial scale
Environment & Safety
/ Refining
/ Biofuels
/ Carbon Management
/ Catalysts
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Process Optimization
/ Products
/ Reactors
/ Treating
/ Europe
Oil demand is expected to reach record highs this year1 after a sharp rebound following the COVID-19 pandemic.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrovietnam says supertanker with Iraqi oil arrives at refinery port 6/1
- Russia bans aviation fuel exports until November 30 6/1
- Green Fuels Operating breaks ground on $400-MM refinery in Oklahoma (U.S.) 6/1
- SABIC puts 141 lots of industrial assets up for public auction 6/1
- Digital Exclusive: Margin left on the table: The hidden cost of supply chain capability gaps in hydrocarbon processing—Part 1 6/1
- Fluor JV received limited notice to proceed for proposed Phase 2 expansion of LNG Canada facility 6/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

