Aronen, R.
Amine pumps upgraded for improved operations and reliability
Asia/Pacific
/ Gas Processing/LNG
/ Maintenance & Reliability
/ Carbon Management
/ Economics
/ Engineering & Design
/ Loss Prevention
/ Pumps
/ Rotating Equipment
/ Safety
A gas processing plant in Malaysia eliminated a source of expensive failures in its acid gas removal unit (AGRU).
Improve pump reliability with advanced composite wear rings
The results were reduced vibration and seal leaks at this plant
Improving equipment reliability through e-learning
It will change the way people work, learn, communicate and solve problems
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- INEOS Inovyn agrees to sell its Italian chlor-alkali business to Esseco Industrial 4/21
- LOTTE Chemical to merge into integrated corporation after spinning off Daesan plant 4/21
- Petronor and H2SITE partner to pioneer high-purity hydrogen production in refining through advanced membrane technology 4/21
- Emerson accelerates edge ecosystem for real-time enterprise operations intelligence 4/21
- Tracerco launches DrumVision™ to deliver real-time process visibility in delayed coking and demanding interface measurement applications 4/21
- IMI signs global framework extension with Solvay for the provision of IIoT sensors 4/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

