Lopez, J. P.
Juan P. Lopez is a Senior Process Safety Engineer at Bechtel. He has more than 10 yr of experience in process safety, including designing emergency relief systems and participating in process hazard analyses. Lopez earned a BS degree in chemical engineering from Texas A&M University and is a registered professional engineer in the State of Texas.
A simplified dynamic approach for storage tank thermal inbreathing rates
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Construction
/ Corrosion
/ Engineering & Design
/ Environment
/ Equipment
/ Heat Transfer
Storage tanks that experience sudden heavy rain on what was a hot sunny day can be damaged due to inadequate venting devices.
Use a simple vapor equation for sizing two-phase pressure relief valves
Pressure relief valves (PRVs) protect process equipment from the hazards of excessive over-pressure.
Vapor velocity guidelines for horizontal flare knockout drums
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
Flare knockout (KO) drums are important components of effluent handling systems.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell collaborates with SAF One and Tata Projects to enable sustainable aviation fuel production 1/29
- Casale and OMNI Sign MoA to jointly advance waste-to-green methanol and hydrogen technologies 1/29
- GIZ and thyssenkrupp nucera partner to advance green hydrogen and power-to-X markets in India 1/29
- IACS issues new Unified Requirement on ammonia release mitigation systems 1/29
- TotalEnergies and Mozambique announce the full restart of the $20-B Mozambique LNG project 1/29
- CF Industries, POET launch low-carbon fertilizer pilot to cut ethanol production carbon intensity 1/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

