Nava, J.
Optimize operating parameters of absorbers/strippers in gas plants
Gas Processing/LNG
/ Process Optimization
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Construction
/ Distillation
/ Economics
/ Engineering & Design
/ Equipment
/ Gas to liquids (GTL)
/ Heat Transfer
/ Middle East
/ Naphtha
Better recovery definition of C3s and C4s from gas absorber/stripper can lower costs
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Pakistan-China to sign MoU on oil-to-chemicals complex in June 5/17
- China biofuel makers bet on sustainable aviation fuel 5/17
- AMETEK Land provides thermal imagers to large ethylene producer 5/17
- China's refinery output falls for first time in 20 mos due to maintenance 5/17
- Dow, SCG Chemicals sign MoU to transform 200,000 tpy of plastic waste into circular products 5/17
- Ukraine long-range attacks continue to disrupt Russian refining, energy operations 5/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction