Thomerson, C.
Celine Thomerson is a Dynamic Simulation Technical Lead at AVEVA. Over the past 15 yr, during her tenure with KBR and AVEVA, she has completed more than a dozen simulation projects, provided training for panel operators and assisted in ammonia plant commissioning. The simulation projects included both engineering studies and operator training simulators. She earned BS and MS degrees in chemical engineering from the University of Houston.
- ... 0 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Brazil's Petrobras approves $1.2 billion investment for renewable fuels plant 6/22
- First batch of equipment arrives in Kazakhstan for $7.7-B Atyrau polyethylene project 6/22
- Explosion at Qatar's Ras Laffan LNG complex kills 13, injures 66 6/22
- Asia has plenty of crude oil, but refined fuels remain tight 6/22
- Fire extinguished at Marathon's Galveston Bay Refinery in Texas (U.S.) 6/22
- El Nino, expanding ethanol use squeeze India sugar supply 6/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

