Grove, T.
Improve seal designs for ‘dirty’ services
Environment & Safety
/ Gas Processing/LNG
/ Maintenance & Reliability
/ Process Optimization
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Carbon Management
/ Construction
/ Corrosion
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Greenhouse Gases
/ Loss Prevention
/ Middle East
/ Piping
/ Pumps
/ Rotating Equipment
Amid regulatory legislation issues, a compliance strategy can drive solutions to optimize reliability of rotating equipment.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- How laser technology cuts through traditional reliability and confidence concerns in industrial gas analysis 5/28
- Why good-enough doesn’t make the grade in high-consequence gas measurements 5/28
- Lummus Technology launches Thermacrack™ C5 to unlock higher-value specialty chemicals production 5/28
- Million-dollar award awaits winner in clean fuel race for ships 5/28
- PTT Global Chemical and SCG sign MoU to explore olefins/polyolefins JV in Thailand 5/28
- Pembina greenlights 750-MMft3d Heartland Extraction Plant to provide ethane feedstock to Dow Chemical 5/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

