Gartside, R. J.
Maximize butene-1 yields
A new reactor system capitalizes on shifting butene-2 to butene-1 from C4 fractions
Fine-tune operations through computational fluid dynamics
Advanced modeling methods assist engineers to troubleshoot existing processing equipment
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Digital Exclusive: Supporting the shipping sector’s decarbonization to a carbon-free future 5/20
- Repsol: Renewable fuels are key to the transformation of the refining industry 5/20
- Pemex is delivering only a fraction of feedstock to new Olmeca refinery 5/20
- Gulfstream LNG export terminal (U.S.) receives U.S. FERC approval 5/20
- China's April gasoline exports fall to lowest level since July 2015 on recovering domestic demand 5/20
- Mammoet successfully transports/installs record-breaking hydrocracker for ORLEN Lietuva refinery 5/20
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction