Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Turbines

HP Engineering Case Histories: Case 85: Learnings on hydraulically fitted hubs

Consulting Engineer: Sofronas, A.

Hubs connect one piece of machinery to another, usually with some flexible coupling between them. Installers have only limited time to work with the hot hub. When incorrectly positioned, it may have to be removed, which has the potential of damaging the shaft end.

HP Reliability: Update on steam turbine overspeed testing

Hydrocarbon Processing Staff: Bloch, Heinz P.

An engineer working for a world-scale oil refinery in Asia-Pacific (AP) asked several questions on steam turbines: “I would like to know whether overspeed testing of steam turbines is recommended..

HP New Developments

Hydrocarbon Processing Staff: Meche, Helen

Aspen Technology’s aspenONE Engineering and aspenONE Manufacturing and Supply Chain Version 8.8 software was developed for firms in the oil, gas, chemicals, engineering and construction, and other process industries.

Maximize energy recovery with small steam turbines

Energent: Kaupert, K.
Energent Corp.: Krull, R.  |  Iles, R.

Using smaller turbines (50 kW to 300 kW) can aid system efficiency and help conserve energy. We investigate examples in which the application of smaller steam turbines provided return on investment within two years.

Lubrication update for rotating equipment

Professional engineer: Bloch, H. P.

API-610 is the most widely used pump standard in the petrochemical and refining industries. It includes experience-based recommendations for lubricant applications and one of those recommendations rel..

HP Engineering Case Histories: Case 83: What are useful questions to ask before starting a vibration analysis?

Consulting Engineer: Sofronas, A.

Periodically, this author receives questions from readers throughout the world addressing what performance issues could be wrong with a centrifugal compressor that is vibrating. Note: It is impossible..

HP Engineering Case Histories: Case 82: Be cautious when purchasing ‘first of kind’ equipment

Consulting Engineer: Sofronas, A.

What is the definition of “first of kind” when discussing equipment and products? The definition used in this editorial is the “first built for your company,” and it can often have..

Update on control and safety systems for turbomachinery

Compressor Controls Corp.: Staroselsky, S.
Compressor Controls: Jacobson, W.  |  McWhirter, J.

All plant workers want to reduce the safety risk associated with turbomachinery operation while avoiding nuisance trips. The goal is to run machines in an efficient manner. In this context, safety ris..

Raise profitability through continuous performance evaluations

Canadian Natural Resources Ltd.: Bhachu, U.

Reliability engineers use a wide variety of tools to support plant equipment and to optimize unit uptime and availability. Sound reliability programs assist organizations to be more competitive in the..

Improve monitoring and troubleshooting of reciprocating compressors

Consultant: Geitner, F. K.
Professional engineer: Bloch, H. P.

The terms surveillance and monitoring for reciprocating compressors can be used interchangeably. With few exceptions, the monitoring and/or surveillance tasks are assigned to the unit operators. They ..