Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Safety

Failure prevention—The ultimate asset management strategy

Small Hammer Inc.: Snider, B.

The primary cause for losses and lost opportunities at refineries, chemical complexes, pipeline networks and gas processing facilities is equipment failures.

Lifting of US crude export ban will impact process safety management

North Highland Worldwide Consulting: Molly, K.

Since the Arab oil embargo in the 1970s, the US government has restricted the export of crude oil to curb dependence on crude oil imports.

Editorial Comment: Maintenance spending to jump in 2016 as refiners catch up with turnarounds

Hydrocarbon Processing Staff: Blume, Adrienne

The number of scheduled refinery turnarounds in North America is anticipated to rise this year after declining sharply in 2015, as refiners delayed maintenance shutdowns to capitalize on abundant quantities of low-priced feedstock.

Reliability: Principles are more important than strategies

Hydrocarbon Processing Staff: Bloch, Heinz P.

A number of US oil refineries have recently asked the question, “When should an equipment repair be classified as rework?”

Innovations

Hydrocarbon Processing Staff: Andrew, Bob

Planned shutdowns, turnarounds and outages (STOs) are often scheduled for preventive maintenance and new equipment installation that must be performed to keep a plant running and in regulatory compliance.

Innovative design configurations for flare system reliability

Fluor Daniel India Pvt. Ltd.: Suares, D. A. G.

The function of a flare system in a refinery or chemical plant is to collect gases released during an overpressure scenario, typically resulting from a plant upset.

In-depth and preemptive front-end planning yields positive project results

Burns & McDonnell: Henre, C.  |  Satterfield, R.
Coffeyville Resources Refining & Marketing LLC: Garris, J.

Despite the challenges that major projects can present (short deadlines, budget constraints and overruns, unforeseen problems onsite and tension throughout executive teams), they can also prove to be a win-win for both the owner and the engineering, procurement and construction (EPC) firm.

Reliability: Transform ODR-OPPM into a worthwhile initiative

Hydrocarbon Processing Staff: Bloch, Heinz P.

ODR, which stands for operator-driven reliability, has recently morphed into a new arrangement of letters: OPPM.

Codes and Standards: How much fireproofing do we need?

The Augustus Group: Murti, D. G.

This article is the first under the Codes and Standards series. The purpose of this series is to make readers aware of code requirements, the interpretations and the limitations as they stand today, and what engineers can do as an alternative engineering. This series is based on the actual implementation of what is narrated and the satisfactory experiences drawn.

Editorial Comment: Corrosion prevention is a necessary cost

Hydrocarbon Processing Staff: Blume, Adrienne

Corrosion is a major maintenance and reliability concern because it has the potential to impact not only plant operations and costs, but also the environment and worker health and safety.