Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Refining

Project Management: Intelligent 3D model for digital project execution

Baker Hughes: Romano, R.  |  Cortesi, M.  |  Magarotto, A.  |  Minnucci, C.  |  Pinto, A.
TechnipFMC: Zannori, R.  |  Tittobello, A.  |  Semeraro, G.

Digital transformation offers the chance to reorganize and develop new models of collaboration that fully leverage the opportunities offered by digital technologies and their benefits across the oil and gas business—particularly for original equipment manufacturers (OEMs) and engineering, procurement and construction (EPC) contractors.

The critical maintenance team: Do you have one?

Consultant: Thorman, G.

Larger plants typically have planners and maintenance supervisors onsite, as well as operations personnel.

Fabrication of clad equipment and piping—Part 2

Fluor: Shargay, C.  |  Carmona, R. K.  |  Daru, K.  |  Desai, J.  |  Irfan, M.
Reliance Industries Ltd.: Panchal, A.

For pressure vessels, heat exchangers and piping in corrosive services, the materials in contact with the process are often required to be high alloys to provide a reliable service life.

The top three causes of contractor and engineering misalignment

Accruent: Eichelberger, N.

When contractors, engineers and operations teams at downstream processing plants do not work together at optimal efficiency, it can present serious problems.

Set correct design specifications for optimized piping and pipe support system

Wood Group: Maiti, S.

During the planning and engineering execution of petrochemical, oil and gas, and power projects, it is essential that the owner and engineering, procurement and construction (EPC) contractor mutually develop a comprehensive and detailed piping design specification.

Understand net gas compressor control logic from a process engineering standpoint

GS Engineering and Construction: Hong, R.  |  Chang, G. S.

In a refinery or petrochemical plant, certain equipment can create “gray areas” between process engineers and instrument engineers.

Cut costs and save time servicing valves during refinery turnarounds

Emerson Automation Solutions: Dalal, N.

Most refineries perform turnaround activities every 3 yr–5 yr to maintain and upgrade plant assets and equipment.

How did asset utilization modeling save Sadara $1 B in capital cost?

Sadara Chemical Co.: Hayek, F.  |  Moran, M.

Sadara is a JV between Saudi Aramco and Dow Chemical.

ADNOC Refining awards design contract for new refinery in Ruwais

ADNOC Refining took a step closer to building the world’s largest integrated refining and petrochemicals complex, in Ruwais, by awarding a Pre-Front End Engineering and Designing contract for the new refinery in Ruwais.

Global Project Data

Hydrocarbon Processing Staff: Nichols, Lee

According to <i>Hydrocarbon Processing’</i>s Construction Boxscore Database, more than 320 new downstream capital projects have been announced over the past year.