Project Management
Ultra-deep desulfurization of FCC gasoline: Reactive adsorption strategy
With an increase in concern for the environment, countries around the world are implementing stringent environmental regulations and are continuously pressuring refiners to reduce the amount of sulfur in transportation fuels—primarily gasoline and diesel—to combat airborne pollution caused by vehicles.
Project Management: Estimate skid and package dimensions
In the absence of vendor quotations or detailed engineering, preliminary dimensions of skids or packages can be estimated quickly using the ratio method.
Industry Perspectives: What are the opportunities for the global HPI?
In the February issue of <i>Hydrocarbon Processing,</i> our editors provided the results of <i>Hydrocarbon Processing’s</i> survey on the challenges that the downstream processing industry may face this year.
Petrochemicals: Which network can fulfil the petrochemical sector’s desire to exploit Industry 4.0?
The global petrochemical industry has not been short of success.
Project Management: Intelligent 3D model for digital project execution
Digital transformation offers the chance to reorganize and develop new models of collaboration that fully leverage the opportunities offered by digital technologies and their benefits across the oil and gas business—particularly for original equipment manufacturers (OEMs) and engineering, procurement and construction (EPC) contractors.
The critical maintenance team: Do you have one?
Larger plants typically have planners and maintenance supervisors onsite, as well as operations personnel.
Fabrication of clad equipment and piping—Part 2
For pressure vessels, heat exchangers and piping in corrosive services, the materials in contact with the process are often required to be high alloys to provide a reliable service life.
Design considerations for rigging and transportation of large process columns
Design guidelines for rigging and transporting large process columns are outlined in this article, along with the various aspects that should be considered during the initial design phase of equipment.
The top three causes of contractor and engineering misalignment
When contractors, engineers and operations teams at downstream processing plants do not work together at optimal efficiency, it can present serious problems.
How did asset utilization modeling save Sadara $1 B in capital cost?
Sadara is a JV between Saudi Aramco and Dow Chemical.
- Baker Hughes, Giammarco Technologies to advance and commercialize hot potassium carbonate for post-combustion carbon capture 1/30
- First successful processing of eMethanol for efuel production in Freiberg 1/30
- Honeywell collaborates with SAF One and Tata Projects to enable sustainable aviation fuel production 1/29
- Casale and OMNI Sign MoA to jointly advance waste-to-green methanol and hydrogen technologies 1/29
- GIZ and thyssenkrupp nucera partner to advance green hydrogen and power-to-X markets in India 1/29
- IACS issues new Unified Requirement on ammonia release mitigation systems 1/29

