Process Optimization
Consider investing in a standard-compliant process analyzer
High profits are realized with accurate vapor pressure testing
Estimate water hammer loads in steam piping
The problem is more complicated because of the two-phase flow
Optimize plant performance using dynamic simulation
This plant case history illustrates the benefits
Rethink your liquid-liquid separations
A fresh look investigates general principles in designing process coalescers
Unifying framework for six sigma and process control
The advances presented will improve quality and productivity
IT/automation convergence revisited
Keeping automation close-coupled to operation is key
Maximize ethylene gain in acetylene removal units
New-generation catalysts and proper operating strategies offer improved selectivity and cycle length
Re-evaluate your expansion projects for the new global market
Tighter economic conditions require refiners to reconsider benchmark and optimization tools for revamps
Explicit friction factor correlations for turbulent fluid flow in noncircular ducts and polymeric fluids
New equation provides highly accurate estimates
New explicit friction factor equation for turbulent flow in rough pipes
It is more reliable and accurate than existing equations
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Bechtel greenlit for Sabine Pass Liquefaction expansion in Southwest Louisiana (U.S.) 5/29
- Philippines receives rare Iranian crude cargo after wartime disruption 5/29
- Gazprom and Sibur resume talks on possible ethane project to supply additional feedstock to the Kazanorgsintez petrochemicals plant 5/29
- European Commission debates policy shift to protect industry from China 5/29
- Mitsui seeks LNG investments to meet power demand from data centers 5/29
- Kenyan government backs Gulf fuel supply deals after opposition criticism 5/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

