Process Optimization
Jacobs wins engineering on Honeywell, Sinochem venture in China
Jacobs Engineering Group will provide engineering and procurement services for the newly-formed joint venture between Honeywell and Sinochem. The joint venture, to be located in Taicang, Jiangsu Province, plans to produce HFC-245fa, a non-ozone-depleting rigid foam blowing agent used in insulation.
Toyo lands engineering design deal for Canada oil sands refinery project
Toyo has been awarded a contract by North West Redwater (NWR) to provide EDS (engineering design specification) work for a heavy oil upgrading and refining complex in Sturgeon County, Alberta. This complex will process bitumen extracted from oil sands producing naphtha, diesel oil and other petroleum products.
Toyo lands project management deal for Venezuela refinery upgrading work
Toyo Engineering, in consortium with a Venezuelan engineering firm Y&V Ingeniería y Construcción, has been awarded a project management consultant contract for a heavy oil upgrading project of Venezuelan national petroleum company PDVSA at its Puerto La Cruz refinery in the State of Anzoátegui. The project aims to satisfy the energy demands of the domestic market in Venezuela and overseas exports.
Optimize capacity for large ethylene oxide reactors
Many factors must be considered in fine-tuning unit design
Investment roadmap: Planning for carbon capture and storage
Reducing emissions can be approached with a similar method to any other new capital project
Knowledge transfer: A primer for major capital projects
Improve transfer strategy across the project supply chain to achieve smooth end-user takeover
Manage risks with dividing-wall column installations
A simple auxiliary configuration and an extensive modeling study can mitigate the implementation risks of DWCs
Preserving knowledge: Keys to effective lifecycle management
Plant information resides in many locations throughout the facility; capturing it is a challenge
Consider these guides for stress relieving of vertical towers
This case history investigates all required post-weld heat treatment for an existing column
HP Reliability: Spare parts availability and the need for non-OEM options
Reliability engineers and their associated job functions often try hard to make their responsible supply-chain staff or purchasing departments understand that it is impossible for the maintenance depa..
- How laser technology cuts through traditional reliability and confidence concerns in industrial gas analysis 5/28
- Why good-enough doesn’t make the grade in high-consequence gas measurements 5/28
- Lummus Technology launches Thermacrack™ C5 to unlock higher-value specialty chemicals production 5/28
- Million-dollar award awaits winner in clean fuel race for ships 5/28
- PTT Global Chemical and SCG sign MoU to explore olefins/polyolefins JV in Thailand 5/28
- Pembina greenlights 750-MMft3d Heartland Extraction Plant to provide ethane feedstock to Dow Chemical 5/28

