Process Optimization
India's Bharat taps CB&I delayed coking technology for Kochi refinery expansion
The Kochi refinery's delayed coking unit will have the capacity to process 3.84 tpd of vacuum resid and small quantities of clarified oil from the FCC. The unit will be designed to produce sour fuel gas, LPG, naphtha, light and heavy gas oil, and petroleum coke. Lummus Technology will provide basic engineering.
Braskem Idesa awards engineering deal on Mexico Ethylene XXI project
The EPC contract was awarded to a joint venture made up of Odebrecht (40%), Technip (40%) and ICA Fluor (20%). The new petrochemical complex will include a 1.05 million tpy ethylene cracker and several integrated polyethylene (PE) plants. Ethylene XXI should begin operations in June 2015.
KBR wins licensing, process design deal for China olefins recovery project
The client owns an existing plant of coal-to-olefins which started last year. It is the world's first and largest coal-to-olefin project using coal as the feedstock to produce polyethylene and polypropylene by coal gasification to methanol, then methanol to olefin (MTO), and then olefin polymerization.
HP Innovations: Innovations
Invensys introduces new technology offeringsSoftware and technology provider Invensys Operations Management recently released a program to help clients modernize and improve the performance of aging c..
HP Construction: North America
Jacobs Engineering Group Inc. has a contract from Methanex Corp. to provide engineering, procurement and construction services for a methanol production facility in Louisiana. Officials estimate the c..
HP Construction: South America
A subsidiary of Foster Wheeler AG’s Global Engineering and Construction Group has a contract from Petrobras for a world-scale grassroots gas-to-chemicals complex—Complexo Gás-Quími..
HP Construction: Europe
Clariant has inaugurated what is said to be Germany’s biggest pilot plant for producing climate-friendly cellulose ethanol from agricultural waste. Located in Straubing, Bavaria, and supported by..
HP Construction: Middle East
KAR Group has announced the third expansion of its Kalak refinery to 185,000 bpd. Process units and utilities are being provided by Ventech Engineers LLC of Pasadena, Texas. Ventech has provided modul..
HP Construction: Asia-Pacific
Jilin Qianyuan Energy Development has selected Chemtex, along with Black & Veatch’s patented PRICO LNG technology, to deliver a major liquefied natural gas (LNG) facility. Expected to be complete..
HP Reliability: Equipment life extension involves upgrades
Every plant wants to get more service life from site machinery. Since about 1990, quite a number of start-up consulting companies have formed to advise clients on equipment life extension. These compa..
- Dow, Ambipar partner to promote plastics recycling in South America 11/26
- Hygenco selects Topsoe as technology provider for green ammonia production 11/26
- Aviation sector officials warn of Trump effect on green jet fuels 11/26
- Russia's oil and gas revenue down by a third in November m/m 11/26
- Contentious COP29 deal shows climate cooperation fraying at edges 11/26
- Oil majors betting big on biofuels with more than 40 projects by 2030 11/26