Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Process Optimization

Seal safety may require going beyond typical standards

AESSEAL plc: Shaw, S.

Top industry professionals believe users must reach beyond typical standards in applying safer mechanical seals when hazardous and toxic chemicals are involved.

Consider both actual and virtual spare parts inventory

Hydrocarbon Processing Staff: Bloch, Heinz P.

Globally, hydrocarbon processing industry (HPI) facilities operate hundreds of thousands of fluid machinery assets. The various service-specific internal components of these assets are supported by ma..

Consider novel CGC and front-end depropanizer system for olefins production

Lamar University: Xu, Q.  |  Fu, J.  |  Zhao, C.

In the presented case study, an innovative design for an integrated CGC-DeC3 system introduces part of the heavier condensate from the early compression stages directly into the high-pressure (HP) depropanizer.

Enhance operation and reliability of dividing-wall columns

LG Chem, Ltd.: Lee, J. W.
Yeungnam University: Lee, M.
LG Chem.: Shin, J.
LG Chem Ltd.: Lee, S.
AMT Pacific Co. Ltd.: Lee, B.

Dividing wall columns (DWCs) are an attractive option when the goals are to reduce energy consumption and capital investment for distillation processes. A major component in a DWC system is the reflux..

Optimize vacuum ejector operations

Turkish Petroleum Refineries Corp. (Tüpraş): Temur, T.  |  Haktanir, M.  |  Uzman, F.  |  Karakaya, M.
Boğaziçi University: Avci, A. K.

Vacuum distillation unit (VDU) designs generally involve jet ejectors due to their low capital and operating expenses, high reliability, durability and simplicity. Once the ejector is installed and co..

Flare header failure: An investigation

Suncor Energy Inc.: Tharakan, J.

A 60-in. flare header suffered three identical failures with buckling and cracking at the circumferential weld at the bottom of the pipe. The failures are believed to have originated during hot relief..

HP Reliability: Manage your time constructively

Hydrocarbon Processing Staff: Bloch, Heinz P.

We often view ourselves as very efficient reliability implementers. Yet, as professional engineers, we take action to save time, accomplish more and reduce stress by applying better time-management sk..

HP Integration Strategies: Asset information management improves life cycle benefits for equipment

ARC Advisory Group: Rio, R.

Traditionally, the various production management and asset management systems in the hydrocarbon processing industry (HPI) and other heavy industries resided in silos with separate management, archite..

HP Viewpoint: Consider integral-gear compressors in CO2 services

Gasification Co.: De Maria, R. L.

In 1998, the author began researching suitable technology for compressing 95 MMSCFD of “bone dry” (–100°F dew point) carbon dioxide (CO2) from 16.7 psia to 2,710 psia. The compress..

HP Engineering Case Histories: Case 72: Interaction between disciplines when troubleshooting

Consulting Engineer: Sofronas, A.

When troubleshooting, we can become fixated on the discipline that we are most familiar—in the author’s case, mechanical engineering. Investigating the failure of a machine may have a group ..