Process Optimization
Freeport LNG chooses CB&I, Zachry Industrial to build first two trains
CB&I and Zachry Industrial have been awarded two contracts, each valued at $2.5 billion, to construct the first two LNG trains of the Freeport liquefaction project in Texas.
CB&I wins FEED work from Gazprom to develop new Russian refinery
CB&I's project scope includes FEED development for multiple new process units, including a 2 million tpy hydrocracker unit licensed by Chevron Lummus, as well as hydrogen, sulfur and other associated units.
Amec awarded services pact for Kuwait refineries
Amec will be responsible for a range of engineering and management services including feasibility studies, front end engineering design, project management consultancy services and training of Kuwaiti engineers.
Gazprom appoints WorleyParsons as contractor for Vladivostok LNG
The WorleyParsons portion of the project includes the FEED deliverables for two 5 million tpy LNG trains with supporting utilities and infrastructure including loading terminal topsides.
Honeywell to automate, provide FEED work on new mega-refinery in Kuwait
With a planned capacity of 615,000 bpd, the new Al Zour refining complex being built in southern Kuwait will be Kuwait’s fourth refinery and the largest refinery in the entire Middle East.
OxyChem, Mexichem choose contractor for new US ethylene cracker
CB&I was awarded the $1 billion engineering and construction contract to build an ethylene cracker with 1.2 billion lb/year of capacity at OxyChem's existing complex in Ingleside, Texas.
Optimize relief loads with dynamic simulation
Pressure relief analysis is a critical task at the engineering design stage of a grassroots oil refinery project. Relief loads must be determined so that the process units and plant flare systems can be designed.
Mitigate heat exchanger corrosion with better construction materials
Better materials can provide optimal equipment service life, reduce maintenance, mitigate contamination by corrosion products and minimize heat loss due to fouling.
Top HPI Projects
Construction of HPI projects involves numerous risks for several parties. The design and construction of such complexes can take years, from project announcement to commissioning of the complexes. The..
Mitigate fouling in crude unit overhead—Part 3
CASE STUDYThe basis for this case study is shown in Fig. 18; it is a crude unit with overhead heat integration. This is a one-drum overhead system with heat integration and no water wash. In an attemp..
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
- Methanex and Entropy partner to reduce emissions in methanol production 7/18
- Abraxas Power awards McDermott ECI contract for Canada's first green ammonia plant 7/18
- ClearSign Technologies to install 26 burners at U.S. Gulf Coast chemical facility 7/18
- CF Industries, POET to demonstrate use of low-carbon ammonia fertilizer to reduce carbon intensity of corn production and ethanol 7/18
- Renewi, Freepoint Eco-Systems to build waste plastic sorting and treatment infrastructure 7/18
- Evolution in the rapid, onsite detection of microbial contamination in diesel fuel 7/18
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries