Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Process Optimization

Freeport LNG chooses CB&I, Zachry Industrial to build first two trains

HP Editorial Staff: HP News

CB&I and Zachry Industrial have been awarded two contracts, each valued at $2.5 billion, to construct the first two LNG trains of the Freeport liquefaction project in Texas.

CB&I wins FEED work from Gazprom to develop new Russian refinery

CB&I's project scope includes FEED development for multiple new process units, including a 2 million tpy hydrocracker unit licensed by Chevron Lummus, as well as hydrogen, sulfur and other associated units.

Amec awarded services pact for Kuwait refineries

Amec will be responsible for a range of engineering and management services including feasibility studies, front end engineering design, project management consultancy services and training of Kuwaiti engineers.

Gazprom appoints WorleyParsons as contractor for Vladivostok LNG

The WorleyParsons portion of the project includes the FEED deliverables for two 5 million tpy LNG trains with supporting utilities and infrastructure including loading terminal topsides.

Honeywell to automate, provide FEED work on new mega-refinery in Kuwait

With a planned capacity of 615,000 bpd, the new Al Zour refining complex being built in southern Kuwait will be Kuwait’s fourth refinery and the largest refinery in the entire Middle East.

OxyChem, Mexichem choose contractor for new US ethylene cracker

HP Editorial Staff: HP News

CB&I was awarded the $1 billion engineering and construction contract to build an ethylene cracker with 1.2 billion lb/year of capacity at OxyChem's existing complex in Ingleside, Texas.

Optimize relief loads with dynamic simulation

CPECC East China Design Branch: Xie, C. L.  |  Wang, Z. G.
SimTech Beijing Ltd.: Qin, Y. F.

Pressure relief analysis is a critical task at the engineering design stage of a grassroots oil refinery project. Relief loads must be determined so that the process units and plant flare systems can be designed.

Mitigate heat exchanger corrosion with better construction materials

Sandvik Materials Technology: Perea, E.

Better materials can provide optimal equipment service life, reduce maintenance, mitigate contamination by corrosion products and minimize heat loss due to fouling.

Top HPI Projects

Hydrocarbon Processing Staff: Romanow, Stephany  |  Thinnes, Billy  |  DuBose, Ben  |  Blume, Adrienne

Construction of HPI projects involves numerous risks for several parties. The design and construction of such complexes can take years, from project announcement to commissioning of the complexes. The..

Mitigate fouling in crude unit overhead—Part 3

CH2M Hill: Sloley, A. W.

CASE STUDYThe basis for this case study is shown in Fig. 18; it is a crude unit with overhead heat integration. This is a one-drum overhead system with heat integration and no water wash. In an attemp..