Petrochemicals
Case history: Failure analysis of a syngas compressor
A first-stage impeller in a synthetic gas compressor failed after 20 years of service. The compressor is a six-stage centrifugal compressor driven by a steam turbine. This case history discusses the i..
HP Boxscore Construction Analysis: Outlook for major revamp projects—Part 2
Worldwide, refiners are investing billions in upgrading and modernizing projects. These efforts are focused on:Increasing flexibility to process heavier, sourer crudesImproving energy efficiencyMeetin..
HP Brief
Train accident raises concerns on safetyThe train derailment that killed at least 38 people in Lac-Mégantic, Quebec, has heightened safety concerns about crude oil shipments by rail. It has been ..
HP Impact: ACC publishes comprehensive economic profile
The American Chemistry Council (ACC) has issued its 2013 guide on the business of chemistry, a detailed economic profile of the chemistry industry and its contributions to the US and world economies.U..
Williams eyes April 2014 restart for fire-damaged olefins plant in Louisiana
While the plant is offline, Williams has been able to resume expansion construction activities across the majority of the plant outside of the incident area. Based on the initial damage assessment, Williams is engaged in the engineering, procurement and demolition of impacted equipment to repair the facility.
Technip, ExxonMobil to license cumene technology for Saudi Rabigh project
Technip and ExxonMobil Chemical were awarded a contract to provide proprietary technology for a 384,000 tpy cumene plant as part of the Rabigh phase two project in Saudi Arabia. The contract includes technology license, engineering, training and start-up services for the cumene plant.
INEOS picks KBR for FEED work on major US Gulf polyethylene proposal
The new INEOS facility for high-density polyethylene is expected to be located in the US Gulf coast area. KBR’s scope of work includes the FEED for the inside and outside battery limit facilities, development of an appropriation grade cost estimate, and order of long lead equipment for the project.
Foster Wheeler to manage new Vietnam project for refining, petrochemicals
The complex will consist of an integrated refinery, processing 200,000 bpd of crude oil, and a petrochemical complex, with associated infrastructure, utilities and offsites facilities. The refinery is designed to process Kuwait Export crude. The plant will have the facilities for full conversion.
Methanex to help develop renewable fuel in Europe
Methanex and CRI said they intend to collaborate on large-scale projects based on CRI's emissions-to-liquids technology. They plan to leverage Methanex's operational experience and global reach with CRI's unique expertise in the production of ultra-low carbon renewable methanol.
Dow chooses Foster Wheeler for Louisiana ethane cracker upgrading project
The objective is to boost the Plaquemine plant's ethane flexibility to take advantage of low-cost feedstocks, specifically via brownfield additions and retrofit modifications.
- ANDRITZ to supply refining technology for cellulosic ethanol pilot plant in the U.S. 3/22
- Brazilian city trials new biofuel aimed at replacing diesel entirely 3/22
- South Korea to review restructuring plan for largest petrochemical complex 3/22
- Shell says Pearl GTL facility's train two in Qatar requires around a year for full repair 3/22
- Iran attacks wipe out 17% of Qatar’s LNG capacity for up to five years 3/22
- The Shipping Corporation of India and Mazagon Dock Shipbuilders sign contract for methanol dual fuel platform supply vessel 3/20

