Middle East
Amec awarded services pact for Kuwait refineries
Amec will be responsible for a range of engineering and management services including feasibility studies, front end engineering design, project management consultancy services and training of Kuwaiti engineers.
Honeywell to automate, provide FEED work on new mega-refinery in Kuwait
With a planned capacity of 615,000 bpd, the new Al Zour refining complex being built in southern Kuwait will be Kuwait’s fourth refinery and the largest refinery in the entire Middle East.
Optimize relief loads with dynamic simulation
Pressure relief analysis is a critical task at the engineering design stage of a grassroots oil refinery project. Relief loads must be determined so that the process units and plant flare systems can be designed.
Mitigate heat exchanger corrosion with better construction materials
Better materials can provide optimal equipment service life, reduce maintenance, mitigate contamination by corrosion products and minimize heat loss due to fouling.
Mitigate fouling in crude unit overhead—Part 3
CASE STUDYThe basis for this case study is shown in Fig. 18; it is a crude unit with overhead heat integration. This is a one-drum overhead system with heat integration and no water wash. In an attemp..
Rethink the hazards in your process
In designing process safety systems, “more” is not necessarily better. Advanced technology has created a mindset to over-install hardware to prevent or to reduce the risk of failure in hydro..
Consider process-based failure analysis methods for piping and equipment
Avoiding incident (or accident) recurrences at industrial systems is a long-standing problem, and it involves process safety strategies (PSSs). Incurring zero incidents is the ultimate goal for any st..
HP Editorial Comment: By the numbers
At times, engineers, bankers, scientists and accountants can be obsessed with numbers. Why? Because numbers are vital, especially in the design and operation of process units and equipment. Anniversar..
HP Reliability: Demand specifics in designing your asset management programs
In 2009, an automation journal commissioned an online survey asking industry observers and practitioners to rank technology trends in 2009 and beyond.1 Table 1 summarizes the respondents’ prefere..
HP Integration Strategies: Engineering design tools are moving to the ‘cloud’
According to a new market study on engineering design tools, new 3D design applications can play an integral part in determining the optimal design, creation and construction of HPI facilities.
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
- Methanex and Entropy partner to reduce emissions in methanol production 7/18
- Gulf Energy Information appoints Catherine Watkins as Chief Commercial Officer to drive market expansion (1) 7/18
- Abraxas Power awards McDermott ECI contract for Canada's first green ammonia plant 7/18
- ClearSign Technologies to install 26 burners at U.S. Gulf Coast chemical facility 7/18
- CF Industries, POET to demonstrate use of low-carbon ammonia fertilizer to reduce carbon intensity of corn production and ethanol 7/18
- Renewi, Freepoint Eco-Systems to build waste plastic sorting and treatment infrastructure 7/18
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries