Management
Methanex awards plant engineering deal to Jacobs for Chile-to-US relocation
Jacobs is already executing site-specific engineering and construction management for the 225-acre location in Geismar, La. from its offices in Baton Rouge, with support for the disassembly from its office in Santiago, Chile. The plant is expected to be operational the second half of 2014.
Utility piping: Why over-engineering is inefficient
Grooved mechanical piping can offer improved constructability, speedy expansion, retrofit and turnaround, and also reduce safety risks. It is a quality pipe-joining method.
Consider new developments for variable-speed electric motors
New challenges, recent developments, the latest mechanical issues and main reliability factors for large variable-speed electric motor drivers in HPI plants are presented here.
HP Insight: How long is an economic cycle for the HPI?
As summer takes hold in the Northern Hemisphere, demand for energy in various forms increases. In looking back over the past 90 years, energy demand and pricing cycle through high and low points. In 2..
HP Integration Strategies: Reliability solutions offer unique value propositions
Globally, the process industries lose the equivalent of 5% of production annually because of unscheduled downtime and poor product quality. ARC Advisory Group estimates that almost 80% of these losses..
HP Construction: Europe
Haldor Topsøe has selected UOP LLC, a Honeywell company, to provide technology to purify hydrogen from a steam-reforming unit to be installed at the Antipinsky refinery in Tyumen, Russia. Honeywe..
HP Construction Profile: Rotterdam LNG facility wins top project award
The Gate megaproject is one of Europe's largest LNG terminals. With two jetties, it can unload simultaneously two vessels of the Q-Max type, the world's biggest LNG carriers.
Fire incident at Jaipur was a wakeup call
After the 2009 accident at Indian Oil's lubricants terminal, new safety standards were developed to help avoid future tragedies. The focus is as it should be, on people, process and technology.
CB&I to buy engineering major Shaw Group, seeks energy diversification
CB&I believes that combining the two companies will create “one of the most complete energy-focused technology, engineering, procurement, fabrication, construction, maintenance, and associated services companies in the world”. The acquisition is expected to close in early 2013.
Impact of advanced engineering and design software on the HPI
Future industry innovations may include more integration of tools and information, improved hardware/software access, and the development of new energy resources.
- ExxonMobil plans 1 Blbs/yr of advanced recycling by 2027 11/22
- Gauging the likely Trump effect on U.S. energy and power sectors 11/22
- Russia's Lukoil restoring cracker at NORSI refinery, gasoline output rising 11/22
- Nigeria's local currency crude sales fall short of target, Dangote refinery says 11/22
- U.S. October gasoline imports hit post-pandemic low on slump in European shipments 11/22
- Clean Hydrogen Works awards McDermott FEED contract for Ascension Clean Energy (ACE) project 11/21