Management
Improve execution of capital projects with advanced technologies
The E&C industry is now poised for a major leap forward in utilizing advancements in information technologies and, thus, enabling itself to greatly boost project performance.
Replan: Modernizing Brazil’s largest crude oil refinery
The project included installing two hydrodesulfurization (HDS) units for the cracked naphtha produced by two catalytic cracking units, a coker naphtha hydrotreating (HDT) unit, and a catalytic reforming unit.
3D laser scanning impacts asset lifecycle management
Few technologies have leaped from research lab to everyday use quite as rapidly as 3D laser scanning. Only a few years ago, this technology was a prototype method that captured fuzzy images of plant e..
Mexico’s major grassroots effort: Ethylene XXI project
The federal government, through Pemex Gas and Petroquímica Básica, using the law that regulates Mexican oil, decided to promote private investment to build a new major petrochemical complex called Ethylene XXI.
Experience meets innovation: World-class coke drum replacement project
Six large coke drums at Chevron’s El Segundo refinery, which supplies 20% of Southern California’s vehicle fuel, were showing signs of aging after 46 years in service.
Successful project development and execution: Beyond EPC to ‘T-EPC’
North America is in the middle of a petrochemical renaissance due to the shale gas tsunami. While this new development is most prevalent in North America, similar trends are expected to develop in oth..
How to select compressors for various process services
Every style or type of compressor was developed to serve a particular process purpose. Collective references have devoted hundreds of thousands of pages on this topic. Two books have attempted to summ..
HP Automation Strategies: Embedded virtualization in process automation systems
An earlier ARC Advisory Group column dealt with server-level virtualization in Collaborative Process Automation Systems (CPAS), the company’s process automation system model. Here, we will addres..
HP Boxscore Construction Analysis: 2014 global construction year in review: 72% growth in new projects
According to Hydrocarbon Processing’s Construction Boxscore Database, new project announcements have climbed to over 500 in 2014. This represents a 72% increase in new project announcements over ..
HP Engineering Case Histories: Case 82: Be cautious when purchasing ‘first of kind’ equipment
What is the definition of “first of kind” when discussing equipment and products? The definition used in this editorial is the “first built for your company,” and it can often have..
- ExxonMobil plans 1 Blbs/yr of advanced recycling by 2027 11/22
- Gauging the likely Trump effect on U.S. energy and power sectors 11/22
- Russia's Lukoil restoring cracker at NORSI refinery, gasoline output rising 11/22
- Nigeria's local currency crude sales fall short of target, Dangote refinery says 11/22
- U.S. October gasoline imports hit post-pandemic low on slump in European shipments 11/22
- Clean Hydrogen Works awards McDermott FEED contract for Ascension Clean Energy (ACE) project 11/21