Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Maintenance & Reliability

Use your data to its full potential to prevent outages

HIMA Americas, Inc.: Creef, B.

In a process plant, the safety system is responsible for the protection of personnel, resources and the environment, by taking the plant to a safe state in the event of a fault. However, is the system capable of contributing more to the plant’s uptime and profitability?

Evaluate structural stiffness for piping stress analysis

Reliance Engineering Group (REG): Choudhury, M. G.  |  Tripathi, R.

Hydrocarbon plants use a system of pipes of various sizes, pressures and temperatures. Sometimes these pipes have pulsating flows that result in piping system vibration. These piping systems must be designed for a high degree of reliability, which requires a comprehensive piping stress analysis for thermal, sustained, occasional and dynamic loading conditions.

Consider pitot tube pumps for low-flow, high-head applications

Saudi Aramco: Alshaye, A.

Low-flow, high-head pumping requirements in refining and petrochemical plants make up less than 2% of the total pump population. This minor percentage is creating significant reliability concerns, which result in low mean-time between failures (MTBF), as well as high maintenance costs.

Eliminate mechanical seal failure in a crude distillation unit

Yanbu Aramco Sinopec Refining Company (YASREF) Ltd.: Telmesani, A. A.

Multiple mechanical seal failures in a crude distillation unit (CDU) resulted in total losses of $3 MM in a refinery since its startup in January 2015. The maximum seal life achieved did not exceed 6 mos, which was much shorter than the American Petroleum Institute (API) 682 “Advancements in Mechanical Sealing” goal of 3 yr of seal life.

Japan plans maintenance at seven naphtha crackers in 2018

TOKYO (Reuters) — Seven naphtha crackers in Japan are expected to be shut in 2018 for scheduled maintenance, industry and company sources said.

Engineering Case Histories—Case 99: Pooling knowledge and experience builds personal and team success

Consulting Engineer: Sofronas, A.

With the help of an excellent mentor, I became adept at analyzing equipment and structures at the start of my career, using analytical techniques.

Reliability: Dry gas sealing technology replaces segmented carbon rings in small steam turbines

Hydrocarbon Processing Staff: Bloch, Heinz P.

Since the late 1800s, small steam turbines have incorporated bushing-type, single-piece and/or segmented carbon gland components to reduce and prevent steam leakage along the shaft.

Incorporate assurance into an operational readiness program—Part 2

Jacobs Consultancy: Picheo, G.  |  Reed, W.

Investors have a critical need for assurance that the asset they are invested in will achieve continuous operation at the designed rates, as well as meet—and hopefully surpass—reliability, availability and maintenance targets safely.

Libya needs a week to repair blown-up oil pipeline

TRIPOLI/BENGHAZI, Libya (Reuters) — A Libyan crude oil pipeline blown up on Tuesday will take about a week to repair, the head of state oil firm NOC told Reuters on Wednesday.

PDVSA at risk of losing Bonaire terminal over maintenance delay

HOUSTON (Reuters) — Venezuela’s PDVSA could lose its license to operate an oil storage terminal it owns on the Dutch Caribbean island of Bonaire if it does not soon fulfill maintenance demands by regulators, a government spokeswoman said on Tuesday.