Loss Prevention
Safety in design during mechanical engineering
After a process engineer has completed preliminary documents such as process flow diagrams, material and energy balance, piping and instrumentation diagrams, equipment data sheets, process control philosophies, identifications of the hazardous nature of raw materials, chemicals, byproducts and final products, process equipment layout drawings (plans and elevations), unit plot plans, etc., these documents are issued to other disciplines to carry out further engineering.
Process safety incidents involving simultaneous operations
Some process safety incidents occur as the result of simultaneous or sequential occurrences of operations or activities that interfere or clash with each other.
Demystify hazardous area classification and compliance assessments
As safety becomes increasingly paramount at hydrocarbon processing facilities, so too does the importance of addressing and clarifying the confusion associated with hazardous area classification (HAC) assessments and compliance auditing in Class 1 locations.
Show Preview: ADIPEC
The 20th edition of Abu Dhabi International Petroleum Exhibition & Conference (ADIPEC) will take place 13–16 November at the Abu Dhabi National Exhibition Centre.
Engineering Case Histories: Case 98—Why performing calculations is important to an engineer’s career
Engineering calculations can help an engineer’s career by controlling the risks taken. The author has followed this path.
Automation Strategies: Expanding scope of automation events and alerts
Detecting, reporting and responding to abnormal situations or events are important functional elements of a complete process automation strategy.
Design atmospheric aboveground storage tanks for accident prevention
The design and construction of oil, gas and petrochemical facilities is continuously improving, as increasing compliance with ever-changing codes and standards, such as the American Petroleum Institute (API) and the National Fire Protection Association (NFPA), is resulting in fewer atmospheric above-ground storage tank (AAST) accidents.
Project Management: Bridging the gap in revamp projects—From business need to design basis
Revamp projects are notorious for scope creep, cost and schedule overruns.
Upgrade the ALARP model as a holistic approach to project risk and decision management
The ALARP (as low as reasonably practicable) model was developed by the UK Health and Safety Executive to establish and justify risk acceptability limits.
FCC collector tray leaks impact column operation
In the collective experience of the authors, one of the most troublesome pieces of refinery fractionation equipment is the collector tray.
- ExxonMobil plans 1 Blbs/yr of advanced recycling by 2027 11/22
- Gauging the likely Trump effect on U.S. energy and power sectors 11/22
- Russia's Lukoil restoring cracker at NORSI refinery, gasoline output rising 11/22
- Nigeria's local currency crude sales fall short of target, Dangote refinery says 11/22
- U.S. October gasoline imports hit post-pandemic low on slump in European shipments 11/22
- Clean Hydrogen Works awards McDermott FEED contract for Ascension Clean Energy (ACE) project 11/21