Loss Prevention
Understand basic engineering codes
Here’s an overview of the nature, use and limitations of US industrial standards
Human factors analysis for process safety
Apply LOPA-HF to a fired furnace
Inherently safer design
Implementation challenges faced by new and existing facilities
Thermal oxidizing systems
Test your knowledge to improve your refinery’s safety and reliability
Improve facility SIS performance and reliability
Use solenoids to partial stroke test block valves
Operator maintenance - key to reducing breakdowns
Here are the benefits and implementation procedures
Pregrouted baseplates reduce installation time and costs
Improving pump reliability is another benefit
Critical situation management – avoid the pitfalls
Guidelines are based on over 50 projects
Improving reliability of chemical processing facilities
An enterprise reliability management system offers powerful failure analysis capabilities
Include your field work force in the automation loop
New technologies reduce maintenance costs and increase productivity
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Valero Energy Q4 profit beats estimates; shares surge 1/30
- Dow launches "Transform to Outperform" to raise the competitive industry benchmark for productivity and growth to enable improved returns 1/30
- Russian oil refineries' peak maintenance expected in January and September 1/30
- U.S. lifts some Venezuela sanctions to ease oil sales 1/30
- Keppel, Aster plan sustainable aviation fuel project in Singapore 1/30
- Boeing, Israel's Technion to develop sustainable aviation fuel, as sector grapples with 2050 goal 1/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

