Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Heat Transfer

Optimize energy savings on steam generation

Fluor Corp.: Sutikno, T.

Steam-turbine selection involves evaluating heat duty vs. work requirements in critical service units

Prevent leaks in heat exchangers

Reliance Industries Ltd.: Rajkumar, R.

Changes in design code lead to solutions for chronic leaking glycol exchanger

Improve heat exchanger design

Heat Transfer Research, Inc.: Farrell, K. J.

Using simulation improves impingement device application in exchangers

Key factors in selecting refractories

Blasch Precision Ceramics: Bolebruch, J.

Advanced ceramics perform well in many applications

Consider low fouling technology for 'dirty' heat transfer services

KLAREN BV: DeBoer, E. F.  |  Klaren, D. G.
Whitson Sullivan Co.: Sullivan, D. W.

Advances in heat exchanger designs mitigate fouling problems with crude oil preheater trains while conserving energy and cutting operating costs

Typical fired heater problems and root causes

Petro-Canada: Patel, S.

A quick look at symptoms can provide operational answers

Improve vertical reboiler piping analysis

Reliance Refinery: Chowdhary, M. G.  |  Darji, P.
Reliance Industries Ltd.: Sharma, R. K.

Vertical reboilers (shell-and-tube heat exchangers) are widely used in the petrochemical industry for performing the necessary vaporization function for various types of distillation columns/separatio..

Optimizing crude oil fired heaters

National Iranian Oil and Petroleum Distribution Company: Dehghani, P.  |  Gargani, S.
Tehran University: Hamidi, A. A.

Case study shows best ways to improve efficiency

Rethink placement of preflash drum in crude preheat train network

Esfahan Oil Refining Co.: Yahyaabadi, R.

Strategic location of the preflash drum not only resolves network problems, but, in some cases, reduces operating costs

Selecting the right steam trap

Richards Industries, Inc.: Frank, S. J.

In addition to the type, consider the installation, maintenance and wasted energy costs during its operating life