Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Environment & Safety

HP Reliability: Not ready for 29-year-old pump packing

Hydrocarbon Processing Staff: Bloch, Heinz P.

In 2009 we were informed about “a nuclear plant that was never commissioned after its original construction. This plant has been sitting idle for 29 years and is only now starting up.” The o..

HP Integration Strategies: The three dimensions of energy management

ARC Advisory Group: de Leeuw, V.  |  Güldner, F.

While we’ve seen many examples of good practices in energy savings and efficiency initiatives, and hear much discussion about the merits of energy-management systems (EMSs), energy management lac..

Advice for 2011: Be dynamic, be flexible; more pain to come

Hydrocarbon Processing Staff: Wright, Tim L.

“Analyze this” is the fad quote and action that actor Robert De Niro famously demands of his unwilling therapist in the film of the same name. Playing Paul Vitti, a New York gangland supremo..

US National Biodiesel Board weighs in on RFS2 lawsuits

 In late May, lawsuits were filed in the US Court of Appeals for the DC Circuit regarding the renewable fuels standard (RFS2) included in the 2007 energy bill. The National Biodiesel Board recent..

Implementing a suitable safety instrumented system-Part 2

Saudi Basic Industries Corp.: Modi, R.

The analysis is the most important step for engineering and designing a suitable system

Performing correct initial blowdown calculations

Sharjah: Vyas, A.

These guidelines can help determine peak flowrate

Establishing safety representatives who are effective

Proconsul Services Ltd.: Alevizos, G.

Follow these protocols for a safer workplace

Implementing a suitable safety instrumented system—Part 1

Saudi Basic Industries Corp.: Modi, R.

The "analysis phase" is the most important step for engineering and designing a suitable system

Purging and inerting large-volume tankage and equipment—jet mixing concept—Part 1

Carmagen Engineering, Inc.: Gollin, M.

Here are the advantages and disadvantages of the various methods

Strategize preshutdown work to enhance productivity

Indian Oil Corp. Ltd.: Kumar, A.

Adopt these principles from a refinery revamp project