Digital Exclusive
Digital Exclusive: The eight best practices for moving safety from compliance to a culture of care
Environment & Safety
/ Loss Prevention
/ Management
/ People
/ Refining
/ Petrochemicals
/ Digital Exclusive
In this article, Owens Corning discusses the importance of safety and provide best practices to institute a culture of safety within an organization.
Digital Exclusive-Flare system design: Liquid pockets in flare headers
Construction
/ Engineering & Design
/ Environment
/ Environment & Safety
/ Furnaces
/ Heat Transfer
/ Loss Prevention
/ Maintenance & Reliability
/ Middle East
/ Natural Gas
/ Petrochemicals
/ Process Optimization
/ Project Management
/ Refining
/ Safety
/ Digital Exclusive
In this technical article, written by Saudi Aramco and Siemens Energy, the authors focus on areas where major benefits can be achieved early in the front-end engineering design (FEED) stage of flare header piping designs.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Singapore's 1H 2024 bunker sales rise on year but June sees a monthly decline 7/15
- Russia may reinstate gasoline export ban from August if shortages worsen 7/15
- Nigeria's NNPC stake in Dangote refinery reduced over non-payment 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction