Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Construction

Evaluate piping for displacement-controlled loading

Suncor Energy Inc.: Tharakan, J.  |  Anisuzzaman, M.

In a Canadian case study, new piping under construction suffered some settlement in the underground portion, as evidenced by soil movement and slight deflection of the above-ground section.

HP Project Management: Better strategies avoid project delays—Part 2

Tecnicas Reunidas: Corrales-Pérez, J.

How can project managers avoid project schedule overruns? Part 1 discussed how to analyze the root causes for project delays. In Part 2, strategies to overcome project delays will be explored.Critical..

HP Global: Russian executives to build country’s first waste oil refinery

Freelance Journalist: Foster, H.

The 4-MMtpy Kirishi-2 refinery is anticipated to cost $3.14 B to construct. Plans call for the refinery to be expanded to a capacity of 12 MMtpy at a later date, at an additional cost of $5 B–$7 B.

Improve the cracking of ethylene dichloride

Linde Engineering North America, Inc.: Shahani, G.  |  Ma, D.

The discovery and exploitation of shale gas in North America is providing a boost to the domestic petrochemical industry. In particular, commodity petrochemicals such as polyvinyl chloride (PVC) are e..

Consider new strategies in defining turnaround or construction contracts

Management Controls Inc.: Harrell, B.

As the use of contract labor to complete refinery turnarounds and construction projects is increasing, success of these projects hinges on the ability of owners and contractors to effectively collabor..

Major refinery uses reliable fiscal metering system

Emerson Process Management: Gupta, T.

Reliance Industries Ltd., ranked 99th on the Fortune 500 list of the world’s major corporations, operates the largest refinery and petrochemical complex. Located in Jamnagar, Gujarat, India (Fig...

HP Project Management: Better strategies avoid project delays—Part 1

Tecnicas Reunidas: Corrales-Pérez, J.

Even when using 3D CAD, advanced project management systems and fast-track concepts, projects now take longer than they did two decades ago. Schedule overruns occur as frequently, despite the applicat..

HP Petrochemicals: Coal re-emerges as a primary petrochemical feedstock

Nexant Consulting: Velson, J.

Coal-to-chemicals routes are now an important and viable option for producers in China and beyond. Those that look upon them as atavistic dinosaurs do so at their peril.

HP Boxscore Construction Analysis: 2014 global construction outlook—Part 2

Hydrocarbon Processing Staff: Nichols, Lee

According to Hydrocarbon Processing’s HPI Market Data 2014, total capital spending is estimated to exceed $77 B. Part 2 of this outlook examines notable construction activities in Africa, Europe, Latin America and the Middle East.

HP Viewpoint: Ethylene production growth drives new global industry standards

Technip: Laugier, J. P.

Operators that understand global market drivers and the latest technologies will provide the best solutions to improve their profitability and comply with the latest HSE rules.