Khan, M. S.
Lessons learned from a refinery revamp project
Revamp projects are inherently challenging due to the numerous constraints imposed by existing equipment design and space limitations.
Take a quicker approach to staggered blowdown
Environment & Safety
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Construction
/ Engineering & Design
/ Equipment
/ Europe
/ Loss Prevention
/ Middle East
/ Piping
/ Reactors
/ Safety
/ Valves
The design of a reliable blowdown system for a large sour gas-processing facility is one of the most important aspects of plant design. Safe design is vital for facility operation. With the developmen..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Perpetual Next appoints Bilfinger as lead consultant for its Methanol Moerdijk project 4/1
- ASRock Industrial and CSI Validate O-PAS™ Systems Management Architecture with the iEP-7020E and AiSMA 4/1
- Heavy equipment for KazMunayGas' Atyrau PE plant ships from Shanghai to Kazakhstan 4/1
- KT Tech awarded early engineering works contract for 60,000-tpy SAF plant in Indonesia 4/1
- OCI Global completes sale of OCI Ammonia Holding to AGROFERT 4/1
- Union workers ratify contract at ExxonMobil's Louisiana (U.S.) refining and chemical complex 4/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

