Lessons learned from a refinery revamp project
Revamp projects are inherently challenging due to the numerous constraints imposed by existing equipment design and space limitations.
Take a quicker approach to staggered blowdown
Environment & Safety
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Construction
/ Engineering & Design
/ Equipment
/ Europe
/ Loss Prevention
/ Middle East
/ Piping
/ Reactors
/ Safety
/ Valves
The design of a reliable blowdown system for a large sour gas-processing facility is one of the most important aspects of plant design. Safe design is vital for facility operation. With the developmen..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- EnEarth awards FEED contract to Kent for the Prinos CO₂ Storage Project in Northern Greece 3/12
- Axens joins consortium trying to develop an eFuels plant in Australia 3/12
- Southern Energy Renewables announce $1.4-B methanol and SAF complex in Louisiana 3/12
- Clariant successfully demonstrates advanced pyrolysis oil upgrading technology for circular plastics with Borealis and SINTEF 3/12
- Indorama Ventures' consortium to develop state-of-the-art rPET facility in Nigeria 3/12
- U.S. sues California over zero emissions vehicle, greenhouse gas rules 3/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction