Singla, P. K.
Pankaj Kumar Singla works as a Senior Engineer at Worley in Al-Khobar, Saudi Arabia. He has more than 13 yr of experience in the detailed engineering of static equipment in the pre-bid phase, as well as front-end engineering design (FEED) and detailed engineering for various oil and gas, petroleum refining and petrochemical industry projects. Prior to joining Worley, Mr. Singla worked as a Static Equipment Engineer for Fluor Daniel India Pvt. Ltd., Daelim Industrial Co. (South Korea) and as a Senior Engineer at Valdel Engineers & Constructors (India). He holds a B. Tech degree from Punjab Technical University, India. The author can be reached at pankajsingla99@gmail.com.
- ... 0 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Aether Fuels and FlyORO sign MoU to explore integrated SAF supply-chain and blending solutions for Project Beacon and future Aether projects 5/12
- Hapag-Lloyd and Kuehne+Nagel to collaborate on lowering emissions in shipping via sustainable marine fuels 5/12
- Jordan commits $1 B to launch first green ammonia export hub in Aqaba 5/12
- Cognite introduces fully integrated, AI-native industrial experience 5/12
- Hengli Petrochemical's former Singapore unit to cease operations 5/12
- Mitsubishi Chemical to withdraw from polybutylene succinate business at PTT MCC Biochem 5/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

