McGinn, S.
HP Petrochemicals: PVC process gets technology and control updates
Environment & Safety
/ Petrochemicals
/ Process Optimization
/ Project Management
/ Acid Gas Removal
/ Americas
/ Aromatics
/ Asia/Pacific
/ Catalysts
/ Construction
/ Drying
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Loss Prevention
/ Management
/ Middle East
/ Polymers
/ Reactors
/ Safety
/ Utilities
KBR has formed an alliance to sell the exclusive license for JNC Corp.’s PVC process technology, which it inherited from CHISSO Corp.’s business, a pioneer in the Japanese chemical industry.
HP Petrochemicals: US condensate exports send ripple effects downstream
The US, which a decade ago was considered an aging has-been in oil and gas production, now leads the globe in production, and a growing bucket of these crudes is light and sweet.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction