Riley, C.
Targeted liquid injection improves shed deck performance
Process Optimization
/ Project Management
/ Refining
/ Americas
/ Asia/Pacific
/ Distillation
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Heat Transfer
/ Management
/ Middle East
This case study shows how the installation of an unique piping and lance design achieved targeted liquid injection, quenched vapor hot zones and reduced resid entrainment into the heavy coker gasoil product.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Digital Feature: Utilizing steam stripping to remove benzene from wastewater and waste streams: A guide to maintaining compliant benzene levels with confidence 4/15
- OQ, Royal Vopak partner to accelerate development of Duqm as an integrated industrial hub 4/15
- Samsung E&A awarded contract for polylactic acid plant in the UAE 4/15
- Kuwait commences merger of state oil firms KNPC and KIPIC 4/15
- Russia well prepared for refinery maintenances with high fuel stockpiles 4/15
- Japan's Fuji Oil restarts 143,000-bpd Sodegaura CDU after fire 4/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction