Ramanath, T.
Tamelarasan Ramanath works as a Process Engineer in the oil and gas industry. His primary research and interests involve areas such as process integration, data analytics using machine-learning tools, and process modeling and optimization for decarbonization strategies. He earned an MEng degree in chemical engineering from the University of Nottingham Malaysia.
Optimization for the trigeneration of industrial waste
Asia/Pacific
/ Boilers
/ Carbon Management
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Greenhouse Gases
/ Heat Transfer
/ Petrochemicals
/ Project Management
/ Refining
/ Turbines
Many corporations are moving toward sustainable operations for their processes. One alternative pathway to reduce fossil fuels consumption in a processing plant is through harvesting waste heat from industrial waste through combined heat and power (CHP), or what is commonly known as cogeneration or polygeneration.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction