Goti, A.
Optimize reordering of critical raw materials and parts
New models evaluate the ‘total’ costs in receiving and storing materials for a refinery
Managing costs and incidents in industrial plant equipment
Use this method to allogate limited maintenance resources to the most critical equipment
Sound-based predictive maintenance: a cost-effective approach
An electronic stethoscope, digital recorder and computer program can detect and diagnose many incipient equipment failures
Optimizing preventive maintenance by combining discrete event simulation and genetic algorithms
Cost and benefit criteria are applied to a multi-equipment system
Multiobjective genetic algorithms optimize maintenance
Overall equipment effectiveness and cost criteria are considered
Money-based overall equipment effectiveness
Use this method to identify, prioritize and quantify inefficiencies
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction