Al Masri, H.
H. Al Masri, University of Bahrain, Department of Engineering Management, Isa Town, Bahrain.
A multi-objective optimization study for an integrated oil refinery-petrochemical plant—Part 2
Construction
/ Cracking
/ Crude oil
/ Economics
/ Engineering & Design
/ Equipment
/ Ethylene
/ Gasoline
/ Hydrocracking
/ Hydrotreating
/ Management
/ Naphtha
/ Octane
/ Petrochemicals
/ Polymers
/ Process Optimization
/ Products
/ Project Management
/ Reactors
/ Refining
/ Gasoil
/ Fuel Oil
/ Olefins
/ Middle East
In this research, the integration of an oil refinery and an ethylene-producing facility was examined using a mixed-integer nonlinear programming model that prioritized maximizing ethylene and propylene production and net profit.
A multi-objective optimization study for an integrated oil refinery-petrochemical plant—Part 1
Catalysts
/ Construction
/ Cracking
/ Crude oil
/ Diesel
/ Distillation
/ Economics
/ Engineering & Design
/ Ethylene
/ Naphtha
/ Natural Gas
/ Octane
/ Petrochemicals
/ Polymers
/ Process Optimization
/ Project Management
/ Reactors
/ Refining
/ Olefins
/ Middle East
The study of the ideal integration of an oil refinery and an ethylene production facility has regained interest due to the rising costs of crude oil and its derivatives. This study proposes a multi-objective optimization approach that maximizes the net profit and production of ethylene and propylene in an integrated plant.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Consortium introduces world's first pharmaceutical bottle partially made with wood-based plastics 10/30
- Aramco, Petrovietnam sign Collaboration Framework Agreement for increased petrochemicals trade 10/30
- TotalEnergies studies Moroccan project to export green ammonia to Europe 10/30
- Changxing Island accelerates development of world-class green petrochemical industrial base 10/30
- U.S. gasoline stockpiles hit 2-yr low on stronger demand 10/30
- Dangote says refinery has 500 MM liters of petrol in storage, can meet Nigeria's demand 10/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction