Tunca, O.
Ozan Tunca is a Process Engineer, responsible for monitoring, troubleshooting and optimizing Prime G+ and FCC units in Tupras’ Izmit refinery. Previously, he worked as a process safety engineer in the oil and gas and petrochemical industries. He earned a BS degree in chemical engineering from Yildiz Technical University.
Izmit FCCU revamp
Tüpraş utilizes proprietary fluid catalytic cracking units<sup>a</sup> (FCCUs) at its Izmit and Izmir refineries. The Izmit unit was designed in 1968 and started up in 1972 with a side-by-side style reactor/regenerator.
FCC and HDS feed flexibility and integration with the delayed coker in the Izmit refinery
Process Optimization
/ Refining
/ Engineering & Design
/ Equipment
/ Gasoline
/ Hydrotreating
/ Loss Prevention
/ Naphtha
/ Natural Gas
/ Sulfur
/ Treating
/ Europe
Operational flexibility is one of the key parameters that leads to success and sustainability in refinery production.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction