Tunca, O.
Ozan Tunca is a Process Engineer, responsible for monitoring, troubleshooting and optimizing Prime G+ and FCC units in Tupras’ Izmit refinery. Previously, he worked as a process safety engineer in the oil and gas and petrochemical industries. He earned a BS degree in chemical engineering from Yildiz Technical University.
Izmit FCCU revamp
Tüpraş utilizes proprietary fluid catalytic cracking units<sup>a</sup> (FCCUs) at its Izmit and Izmir refineries. The Izmit unit was designed in 1968 and started up in 1972 with a side-by-side style reactor/regenerator.
FCC and HDS feed flexibility and integration with the delayed coker in the Izmit refinery
Process Optimization
/ Refining
/ Engineering & Design
/ Equipment
/ Gasoline
/ Hydrotreating
/ Loss Prevention
/ Naphtha
/ Natural Gas
/ Sulfur
/ Treating
/ Europe
Operational flexibility is one of the key parameters that leads to success and sustainability in refinery production.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- EnEarth awards FEED contract to Kent for the Prinos CO₂ Storage Project in Northern Greece 3/12
- Axens joins consortium trying to develop an eFuels plant in Australia 3/12
- Southern Energy Renewables announce $1.4-B methanol and SAF complex in Louisiana 3/12
- Clariant successfully demonstrates advanced pyrolysis oil upgrading technology for circular plastics with Borealis and SINTEF 3/12
- Indorama Ventures' consortium to develop state-of-the-art rPET facility in Nigeria 3/12
- Middle East conflict could force up to 6 MMbpd crude run cuts across Asia 3/11
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

