Şanli, H. Ç.
Handan Çevik Şanli is a Process Control Superintendent responsible for implementation, maintenance and performance monitoring of APC projects for Turkish Petroleum Refineries Corp. Her responsibilities include base layer control enhancement; distributed control system (DCS) management and configuration for process control schemes; alarm management implementations for refineries; and identification of new advanced control and DCS level control strategies for increased operational benefits and optimization. Ms. Şanli earned a BS degree in chemical engineering from Middle East Technical University, and an MS degree in engineering management from the Izmir Institute of Technology. She can be reached at handan.cevik@tupras.com.tr.
- ... 0 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Commonwealth LNG gets green light to start construction of $13-B, 9.5-MMtpy LNG terminal 5/15
- ARENA to drive Australia's $1.1-B Cleaner Fuels Program 5/15
- Japan’s first green ammonia plant based on KBR’s K-GreeN process now fully operational 5/15
- Repsol's Chairman asserts the role of refining as a strategic industry for Spain and for Europe 5/15
- Hazer and Continental Renewable Ventures sign MoU to explore low-carbon fuels projects in Australia 5/15
- Premiums for Russian ESPO Blend oil weaken on poor Chinese refining margins 5/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

