Azizoğlu, Z.
Zeynep Azizoğlu is a Process Chief Engineer, responsible for troubleshooting, monitoring and processing of the KTU and LPG Merox units at the Tupras’ Izmit refinery. She previously worked at TU Delft as a guest researcher. She earned a BS degree in chemical engineering and materials engineering from Istanbul Technical University (ITU), and an MS degree in materials engineering and nanotechnology from Politecnico di Milano.
FCC and HDS feed flexibility and integration with the delayed coker in the Izmit refinery
Process Optimization
/ Refining
/ Engineering & Design
/ Equipment
/ Gasoline
/ Hydrotreating
/ Loss Prevention
/ Naphtha
/ Natural Gas
/ Sulfur
/ Treating
/ Europe
Operational flexibility is one of the key parameters that leads to success and sustainability in refinery production.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Singapore's 1H 2024 bunker sales rise on year but June sees a monthly decline 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction