P. Bernadi
PIERRE BERNADI brings more than 25 yrs of experience at TotalEnergies, primarily within the Refining and Chemicals Branch (Downstream). Throughout his career, Dr. Bernadi has held a variety of roles including Research Engineer, Process Modeling Engineer, Project Studies Lead, Refinery Senior Process Engineer and Process Group Leader. He presently serves as Technical Advisor for Advanced Monitoring and Modeling, where he focuses on leveraging data and analytics to optimize industrial performance. He holds an MS degree in chemistry and a PhD in heterogeneous catalysis.
- ... 0 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ADNOC deploys heavy-duty inspector robot for hazardous environments 5/21
- Indonesia to roll out ethanol-blended gasoline, B50 biodiesel from July 1 5/21
- Australia plans biofuel mandates to boost its energy security 5/21
- HyOrc commences fabrication for Porto waste-to-methanol plant and advances European project pipeline 5/21
- Chevron introduces next-gen Techron in U.S. Chevron and Texaco gasolines 5/21
- Kremlin sees no risk to fuel supply in Russia amid attacks on refineries 5/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

