Putra, Z. A.
is a process engineering and process technology consultant at TMC Chemical in The Netherlands. He has been involved in a wide range of work activities, such as conceptual process designs, feasibility studies, basic engineering design and plant performance evaluations, which include process simulation, optimization and debottlenecking studies. He holds a PDEng degree from Technische Universiteit of Eindhoven.
Improve performance and reduce costs of wastewater treatment plants
The increasing costs of a wastewater treatment plant (WWTP) motivated a major specialty chemical plant to improve the performance of its treatment unit.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Indian Oil Corp to build $7.1-B dual-feed cracker in Odisha state 4/8
- bp halts plans to make clean jet fuel at Spain plant 4/8
- Suncor reports planned equipment shutdown at Montreal refinery 4/8
- India's HPL to start maintenance turnaround at Haldia petrochemical complex in mid-April 4/8
- Holcim, IGNIS P2X and Exolum present ECO2FLY: a pioneering project for the decarbonization of the construction materials and air transport industries 4/8
- Towngas to supply green methanol to Golden Island for Singapore bunkering operations 4/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction