Gous, G.
Gustaf Gous works as a Process Control Consultant at Analyte Control. He graduated from the Department of Chemical Engineering, University of Pretoria, with a B-Eng degree in chemical engineering in 1987, followed by a B-Eng (Honors) and an M-Eng degree. He is now occupied with pursuing a PhD.
Integral vs. proportional gap for averaging level control
In process plants, many instances of level control are required to keep the material balance of the plant from integrating to undesired operating conditions.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Evonik presents innovative "Debonding on Demand" concept for more sustainable bonding 4/3
- Oil, gas and refined product imports exempted from Trump’s sweeping tariffs 4/3
- Reliance: India's gasoline demand to peak by 2035, diesel by 2041 4/3
- Mabanaft, HIF Global sign agreement to accelerate e-methanol adoption in the shipping industry 4/3
- Burckhardt Compression awarded digital monitoring services contract for a chemical plant in Saudi Arabia 4/3
- Lummus completes successful startup of electric heater demonstration unit 4/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction