Gous, G.
Gustaf Gous works as a Process Control Consultant at Analyte Control. He graduated from the Department of Chemical Engineering, University of Pretoria, with a B-Eng degree in chemical engineering in 1987, followed by a B-Eng (Honors) and an M-Eng degree. He is now occupied with pursuing a PhD.
Integral vs. proportional gap for averaging level control
In process plants, many instances of level control are required to keep the material balance of the plant from integrating to undesired operating conditions.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Digital Feature: Utilizing steam stripping to remove benzene from wastewater and waste streams: A guide to maintaining compliant benzene levels with confidence 4/15
- OQ, Royal Vopak partner to accelerate development of Duqm as an integrated industrial hub 4/15
- Samsung E&A awarded contract for polylactic acid plant in the UAE 4/15
- Kuwait commences merger of state oil firms KNPC and KIPIC 4/15
- Russia well prepared for refinery maintenances with high fuel stockpiles 4/15
- Japan's Fuji Oil restarts 143,000-bpd Sodegaura CDU after fire 4/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction