Allah, W. K.
Wesam Khalaf Allah is a Saudi Aramco Engineer specialized in rotating equipment. He is currently a graduate mechanical engineering student at Texas A&M University.
Intensive study on damaged wear rings of centrifugal pumps—Part 2
This article is a continuation of Part 1, which discussed the evaluation of two damaged wear rings from centrifugal pump applications—a stationary (inner) ring and a rotating (outer) ring.
Intensive study on damaged wear rings of centrifugal pumps—Part 1
This article is based on damaged wear rings from centrifugal pump applications.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Indian Oil Corp to build $7.1-B dual-feed cracker in Odisha state 4/8
- bp halts plans to make clean jet fuel at Spain plant 4/8
- Suncor reports planned equipment shutdown at Montreal refinery 4/8
- India's HPL to start maintenance turnaround at Haldia petrochemical complex in mid-April 4/8
- Holcim, IGNIS P2X and Exolum present ECO2FLY: a pioneering project for the decarbonization of the construction materials and air transport industries 4/8
- Towngas to supply green methanol to Golden Island for Singapore bunkering operations 4/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction