Troyer, D.
Drew Troyer joined T.A. Cook in 2018 in the role as Principle. He brings nearly 30 yr of experience and thought leadership in the fields of manufacturing reliability engineering and physical asset management. He is a Certified Reliability Engineer and an MB. Mr. Troyer earned an MS degree in sustainability and environmental management from Harvard University.
Safety and environmental benefits of reliability engineering
Environment & Safety
/ Refining
/ Boilers
/ Carbon Management
/ Distillation
/ Environment
/ Equipment
/ Loss Prevention
/ Motors
/ People
/ Rotating Equipment
/ Safety
/ Turbines
/ Utilities
/ Valves
/ Americas
When you boil down the mission of reliability to its bare essence, the job is to deliver maximum operational availability for the least amount of money over the lifecycle of the asset.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction