Sivaraman, S.
Estimating tank calibration uncertainty
Use these calculations for a specific tank calibration
Determine 'unknown loss' in refineries and terminals
Use the systematic error component of a measuring device to correct mass/ volume balances
Determining system capability for loss control and custody transfers
The key is a planned evaluation of the measurement systems and procedures
Tank gauging or metering: guidelines for selection
Here are the deciding factors for custody transfer applications
Standardizing emerging metering and electronics technologies
Use these guidelines for testing and analyzing new technologies for custody transfer applications
Use ATG for tank-based custody transfers
The technology is now accurate and reliable enough for these applications
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrovietnam says supertanker with Iraqi oil arrives at refinery port 6/1
- Russia bans aviation fuel exports until November 30 6/1
- Green Fuels Operating breaks ground on $400-MM refinery in Oklahoma (U.S.) 6/1
- SABIC puts 141 lots of industrial assets up for public auction 6/1
- Digital Exclusive: Margin left on the table: The hidden cost of supply chain capability gaps in hydrocarbon processing—Part 1 6/1
- bp sells 5% stake in Australian Browse LNG project to South Korea's GS Energy 6/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

