Improve relief-device sizing under supercritical conditions
Environment & Safety
/ Process Optimization
/ Project Management
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Construction
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Loss Prevention
/ Management
/ Middle East
/ Safety
Properly sized relief devices under supercritical conditions are vital to processing natural gas and gas condensates into olefins. These processes operate near the critical locus of the process gases ..
Relief valve and flare action items: What plant engineers should know
Environment & Safety
/ Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Middle East
/ Valves
This article can help the plant engineer review the concerns developed by the design engineer. Implementing field modifications without performing such a review is costly and exposes a facility to unjustified risks.
Relief device inlet piping: Beyond the 3 percent rule
With careful consideration, an engineer can be certain that an installation will not chatter
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Equinor selects Aker for Mongstad refinery upgrade project 5/1
- Australian researchers testing SAF production from landfill gases 5/1
- ACC responds to U.S. EPA's final risk management rule for methylene chloride 5/1
- Topsoe awarded contract to support FEED study for new low-carbon ammonia plant in Louisiana (U.S.) 5/1
- ClearSign Technologies receives burner contract for California (U.S.) refinery 5/1
- Traders scramble for U.S. storage as distillates demand disappoints 5/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction