Burgess, J.
Improve relief-device sizing under supercritical conditions
Environment & Safety
/ Process Optimization
/ Project Management
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Construction
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Loss Prevention
/ Management
/ Middle East
/ Safety
Properly sized relief devices under supercritical conditions are vital to processing natural gas and gas condensates into olefins. These processes operate near the critical locus of the process gases ..
Relief valve and flare action items: What plant engineers should know
Environment & Safety
/ Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Middle East
/ Valves
This article can help the plant engineer review the concerns developed by the design engineer. Implementing field modifications without performing such a review is costly and exposes a facility to unjustified risks.
Relief device inlet piping: Beyond the 3 percent rule
With careful consideration, an engineer can be certain that an installation will not chatter
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Singapore's 1H 2024 bunker sales rise on year but June sees a monthly decline 7/15
- Russia may reinstate gasoline export ban from August if shortages worsen 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction